← All projects

Sabah Café

F&B · Maadi, Cairo · 2025

Project data

Client
Sabah Hospitality
Sector
F&B
Location
Maadi, Cairo
Completed
2025
Area
210 m²
Programme
8 weeks
Design
Azure design team

Scope

  • Interior design
  • Kitchen & extract engineering
  • District approvals
  • Fit-out construction
  • Furniture & lighting procurement
  • Handover

A neighbourhood café in Maadi, designed and built by Azure in eight weeks, with the kitchen and extract engineered around a tight shell.

Our first F&B design-and-build appointment. The operator wanted a warm, material-led room and a kitchen that could handle breakfast peaks. Azure designed the interior, engineered the kitchen extract through a constrained roof zone, and built it out with local trade partners.

Next project
Northline Offices